Home | About Harris | Parts & Service | Case Studies | Contact Us

Environmental Rooms

Dry Rooms

Clean Rooms

Archival Storage Vaults

Stress Screening Chambers

Service Division

Site Map

SCOPE OF PROJECTS

ENVIRONMENTAL SERVICE DIVISION
 
  Environmental Rooms  
  Dry Rooms  
  Clean Rooms  
  Archival Storage Rooms  
  Cycling Chambers  
  Stress Chambers  
  Lab Equipment  
  Ultra-low Temperature Freezers  
     
HVAC DIVISION Ventilation / Ductwork
 
  Chillers  
    Reciprocating
    Centrifugal
    Screw
     
  Split Systems (2-200 tons)  
     
  Heat Pumps  
    Water Source
    Air to Air
    Geo Thermal
     
  Rooftop Equipment  
    Constant Volume
    VAV Systems
     
  Process Equipment  
    Special Chillers
    Fluid Coolers
     
  Cooling Towers  
    Open Systems
    Closed Loop Systems
     
  Heating  
    Gas Fired Boilers
    Forced Hot Air Systems
    Make Up Air Systems
     
REFRIGERATION DIVISION
 
  Ice Rinks  
  Walk-In Boxes  
  Reach-in Units  
  Ice Machines  
  Laboratory Refrigeration  
  Restaurant Refrigeration  
  Pharmaceutical Refrigeration  
     
COMPUTER ROOMS
 
  Liebert Factory Authorized  
  ATS Factory Authorized  
  Stultz Factory Authorized  
     
CONTROLS
 
  DDC Systems  
  PLC Systems  
  Microprocessors  
     
CALIBRATION
 
  Traceable to NIST Certification  
     
PARTS DEPARTMENT
 
  OEM Parts for Harris Equipment  
  Spare parts for various manufacturers  

(return to Service Division)